本文主要是介绍SpringBoot整合Quartz实现动态的创建或删除定时任务并将定时调度任务持久化到MySQL以及Quartz集群配置,希望对大家解决编程问题提供一定的参考价值,需要的开发者们随着小编来一起学习吧!
1.创建quartz数据库并导入quartz的SQL脚本文件
quartz源码下载地址:http://www.quartz-scheduler.org/downloads/
下载完成后解压,在/src/org/quartz/impl/jdbcjobstore
可以找到对应数据库的SQL脚本
我这里使用的是MySQL数据库,SQL脚本如下:
CREATE DATABASE `quartz` /*!40100 DEFAULT CHARACTER SET utf8 */;DROP TABLE IF EXISTS QRTZ_FIRED_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_PAUSED_TRIGGER_GRPS;
DROP TABLE IF EXISTS QRTZ_SCHEDULER_STATE;
DROP TABLE IF EXISTS QRTZ_LOCKS;
DROP TABLE IF EXISTS QRTZ_SIMPLE_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_SIMPROP_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_CRON_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_BLOB_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_TRIGGERS;
DROP TABLE IF EXISTS QRTZ_JOB_DETAILS;
DROP TABLE IF EXISTS QRTZ_CALENDARS;CREATE TABLE QRTZ_JOB_DETAILS(SCHED_NAME VARCHAR(120) NOT NULL,JOB_NAME VARCHAR(200) NOT NULL,JOB_GROUP VARCHAR(200) NOT NULL,DESCRIPTION VARCHAR(250) NULL,JOB_CLASS_NAME VARCHAR(250) NOT NULL,IS_DURABLE VARCHAR(1) NOT NULL,IS_NONCONCURRENT VARCHAR(1) NOT NULL,IS_UPDATE_DATA VARCHAR(1) NOT NULL,REQUESTS_RECOVERY VARCHAR(1) NOT NULL,JOB_DATA BLOB NULL,PRIMARY KEY (SCHED_NAME,JOB_NAME,JOB_GROUP)
);CREATE TABLE QRTZ_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,JOB_NAME VARCHAR(200) NOT NULL,JOB_GROUP VARCHAR(200) NOT NULL,DESCRIPTION VARCHAR(250) NULL,NEXT_FIRE_TIME BIGINT(13) NULL,PREV_FIRE_TIME BIGINT(13) NULL,PRIORITY INTEGER NULL,TRIGGER_STATE VARCHAR(16) NOT NULL,TRIGGER_TYPE VARCHAR(8) NOT NULL,START_TIME BIGINT(13) NOT NULL,END_TIME BIGINT(13) NULL,CALENDAR_NAME VARCHAR(200) NULL,MISFIRE_INSTR SMALLINT(2) NULL,JOB_DATA BLOB NULL,PRIMARY KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP),FOREIGN KEY (SCHED_NAME,JOB_NAME,JOB_GROUP)REFERENCES QRTZ_JOB_DETAILS(SCHED_NAME,JOB_NAME,JOB_GROUP)
);CREATE TABLE QRTZ_SIMPLE_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,REPEAT_COUNT BIGINT(7) NOT NULL,REPEAT_INTERVAL BIGINT(12) NOT NULL,TIMES_TRIGGERED BIGINT(10) NOT NULL,PRIMARY KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP),FOREIGN KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)REFERENCES QRTZ_TRIGGERS(SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)
);CREATE TABLE QRTZ_CRON_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,CRON_EXPRESSION VARCHAR(200) NOT NULL,TIME_ZONE_ID VARCHAR(80),PRIMARY KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP),FOREIGN KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)REFERENCES QRTZ_TRIGGERS(SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)
);CREATE TABLE QRTZ_SIMPROP_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,STR_PROP_1 VARCHAR(512) NULL,STR_PROP_2 VARCHAR(512) NULL,STR_PROP_3 VARCHAR(512) NULL,INT_PROP_1 INT NULL,INT_PROP_2 INT NULL,LONG_PROP_1 BIGINT NULL,LONG_PROP_2 BIGINT NULL,DEC_PROP_1 NUMERIC(13,4) NULL,DEC_PROP_2 NUMERIC(13,4) NULL,BOOL_PROP_1 VARCHAR(1) NULL,BOOL_PROP_2 VARCHAR(1) NULL,PRIMARY KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP),FOREIGN KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)REFERENCES QRTZ_TRIGGERS(SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)
);CREATE TABLE QRTZ_BLOB_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,BLOB_DATA BLOB NULL,PRIMARY KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP),FOREIGN KEY (SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)REFERENCES QRTZ_TRIGGERS(SCHED_NAME,TRIGGER_NAME,TRIGGER_GROUP)
);CREATE TABLE QRTZ_CALENDARS(SCHED_NAME VARCHAR(120) NOT NULL,CALENDAR_NAME VARCHAR(200) NOT NULL,CALENDAR BLOB NOT NULL,PRIMARY KEY (SCHED_NAME,CALENDAR_NAME)
);CREATE TABLE QRTZ_PAUSED_TRIGGER_GRPS(SCHED_NAME VARCHAR(120) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,PRIMARY KEY (SCHED_NAME,TRIGGER_GROUP)
);CREATE TABLE QRTZ_FIRED_TRIGGERS(SCHED_NAME VARCHAR(120) NOT NULL,ENTRY_ID VARCHAR(95) NOT NULL,TRIGGER_NAME VARCHAR(200) NOT NULL,TRIGGER_GROUP VARCHAR(200) NOT NULL,INSTANCE_NAME VARCHAR(200) NOT NULL,FIRED_TIME BIGINT(13) NOT NULL,SCHED_TIME BIGINT(13) NOT NULL,PRIORITY INTEGER NOT NULL,STATE VARCHAR(16) NOT NULL,JOB_NAME VARCHAR(200) NULL,JOB_GROUP VARCHAR(200) NULL,IS_NONCONCURRENT VARCHAR(1) NULL,REQUESTS_RECOVERY VARCHAR(1) NULL,PRIMARY KEY (SCHED_NAME,ENTRY_ID)
);CREATE TABLE QRTZ_SCHEDULER_STATE(SCHED_NAME VARCHAR(120) NOT NULL,INSTANCE_NAME VARCHAR(200) NOT NULL,LAST_CHECKIN_TIME BIGINT(13) NOT NULL,CHECKIN_INTERVAL BIGINT(13) NOT NULL,PRIMARY KEY (SCHED_NAME,INSTANCE_NAME)
);CREATE TABLE QRTZ_LOCKS(SCHED_NAME VARCHAR(120) NOT NULL,LOCK_NAME VARCHAR(40) NOT NULL,PRIMARY KEY (SCHED_NAME,LOCK_NAME)
);commit;
2.构建SpringBoot工程整合Quartz
1.引入Quartz的POM依赖
<dependency><groupId>org.springframework.boot</groupId><artifactId>spring-boot-starter-quartz</artifactId>
</dependency>
2.YML配置
配置参考:https://github.com/wangmaoxiong/quartzjdbc/blob/master/src/main/resources/application-cluster.yml
spring:# Mysql数据库datasource:driver-class-name: com.mysql.cj.jdbc.Driverurl: jdbc:mysql://127.0.0.1:3306/quartz?autoReconnect=true&useUnicode=true&characterEncoding=utf8&zeroDateTimeBehavior=CONVERT_TO_NULL&useSSL=false&serverTimezone=CTTusername: rootpassword: root# 连接池大小max-active: 20max-pool-prepared-statement-per-connection-size: 20# quartz相关配置quartz:# 将任务等保存化到数据库job-store-type: jdbc# 程序结束时会等待quartz相关的内容结束wait-for-jobs-to-complete-on-shutdown: true# QuartzScheduler启动时更新己存在的Job,这样就不用每次修改targetObject后删除qrtz_job_details表对应记录overwrite-existing-jobs: trueproperties:org:quartz:# scheduler相关scheduler:# scheduler的实例名instanceName: schedulerinstanceId: AUTO# 持久化相关jobStore:class: org.quartz.impl.jdbcjobstore.JobStoreTXdriverDelegateClass: org.quartz.impl.jdbcjobstore.StdJDBCDelegate# 表示数据库中相关表是QRTZ_开头的tablePrefix: QRTZ_useProperties: false# 配置集群# 是否加入集群isClustered: true# 容许的最大作业延长时间clusterCheckinInterval: 20000# 线程池相关threadPool:class: org.quartz.simpl.SimpleThreadPool# 线程数threadCount: 10# 线程优先级threadPriority: 5threadsInheritContextClassLoaderOfInitializingThread: true
3.编写Job类
/*** @Author ScholarTang* @Date 2021/7/14 下午4:09* @Desc 定时任务处理(允许并发执行)*/
@Slf4j
@Component
public class QuartzJobExecution implements Job {@Autowiredprivate SendNoticeUtils sendNoticeUtils;@SneakyThrows@Overridepublic void execute(JobExecutionContext jobExecutionContext) throws JobExecutionException {//执行逻辑体,发送消息sendNoticeUtils.sendNotice(jobExecutionContext);}
}
4.编写一个工具类,用来创建、删除定时调度任务的工具类
/*** @Author ScholarTang* @Date 2021/7/15 下午3:50* @Desc 定时任务工具类*/@Component
public class ScheduleUtils {@Autowiredprivate Scheduler scheduler;/*** 构建任务触发对象* @param jobName* @param jobGroup* @return*/public TriggerKey getTriggerKey(String jobName, String jobGroup) {return TriggerKey.triggerKey(jobName, jobGroup);}/*** 构建任务键对象* @param jobName* @param jobGroup* @return*/public JobKey getJobKey(String jobName, String jobGroup) {return JobKey.jobKey(jobName, jobGroup);}/*** 创建日定时调度任务* @param schedulingTaskVo* @throws SchedulerException* @throws TaskException*/public void createScheduleJob(SchedulingTaskVo schedulingTaskVo) throws SchedulerException, TaskException {// 构建job信息String jobName = schedulingTaskVo.getJobId() + "_" + schedulingTaskVo.getJobName();String jobGroupName = schedulingTaskVo.getJobGroupName();//构建job实例JobDetail jobDetail = JobBuilder.newJob(QuartzJobExecution.class).withIdentity(getJobKey(jobName, jobGroupName)).build();// 表达式调度构建器CronScheduleBuilder cronScheduleBuilder = CronScheduleBuilder.cronSchedule(schedulingTaskVo.getCronExpression());cronScheduleBuilder = handleCronScheduleMisfirePolicy(schedulingTaskVo, cronScheduleBuilder);// 按新的cronExpression表达式构建一个新的triggerCronTrigger trigger = TriggerBuilder.newTrigger().withIdentity(getTriggerKey(jobName, jobGroupName)).withSchedule(cronScheduleBuilder).build();// 放入参数,运行时的方法可以获取jobDetail.getJobDataMap().put("TASK_PROPERTIES", schedulingTaskVo);// 判断是否存在if (scheduler.checkExists(getJobKey(jobName, jobGroupName))) {// 防止创建时存在数据问题 先移除,然后在执行创建操作scheduler.deleteJob(getJobKey(jobName, jobGroupName));}//创建定时任务调度scheduler.scheduleJob(jobDetail, trigger);// 暂停任务if (schedulingTaskVo.getStatus().equals(ScheduleConstants.Status.PAUSE.getValue())) {scheduler.pauseJob(getJobKey(jobName, jobGroupName));}}/*** 删除定时调度任务* @param schedulingTaskVo* @throws SchedulerException*/public void deleteScheduleJob(SchedulingTaskVo schedulingTaskVo) throws SchedulerException {scheduler.deleteJob(getJobKey(schedulingTaskVo.getJobId() + "_" + schedulingTaskVo.getJobName(), schedulingTaskVo.getJobGroupName()));}/*** 设置定时任务策略* @param SchedulingTaskVo* @param cb* @return*/public CronScheduleBuilder handleCronScheduleMisfirePolicy(SchedulingTaskVo SchedulingTaskVo, CronScheduleBuilder cb) throws TaskException {switch (SchedulingTaskVo.getMisfirePolicy()) {case "0":return cb;case "1":return cb.withMisfireHandlingInstructionIgnoreMisfires();case "2":return cb.withMisfireHandlingInstructionFireAndProceed();case "3":return cb.withMisfireHandlingInstructionDoNothing();default:throw new TaskException("任务失败策略 '" + SchedulingTaskVo.getMisfirePolicy()+ "' 不能在cron计划任务中使用", TaskException.Code.CONFIG_ERROR);}}
}
5.异常类
/*** @Author ScholarTang* @Date 2021/7/15 上午11:40* @Desc 计划策略异常类*/public class TaskException extends Exception {private static final long serialVersionUID = 1L;private Code code;public TaskException(String msg, Code code) {this(msg, code, null);}public TaskException(String msg, Code code, Exception nestedEx) {super(msg, nestedEx);this.code = code;}public Code getCode() {return code;}public enum Code {TASK_EXISTS, NO_TASK_EXISTS, TASK_ALREADY_STARTED, UNKNOWN, CONFIG_ERROR, TASK_NODE_NOT_AVAILABLE, SEND_NOTICE_ERROR}
}
6.最后
到这里定时调度服务的代码就写完了,如果是想动态的去创建/删除定时调度任务的话只需要将这个utils工具类注入到需要使用它的类中,去调用工具类中的方法创建或删除定时任务即可。
在创建任务时会将任务持久化到数据库,删除则是将数据库中存储的定时任务进行删除。
这篇关于SpringBoot整合Quartz实现动态的创建或删除定时任务并将定时调度任务持久化到MySQL以及Quartz集群配置的文章就介绍到这儿,希望我们推荐的文章对编程师们有所帮助!